Academic Timetables

Academics Notices

Wipro Re-Assessment Shortlisted Students Details

All the shortlisted students do prepare well for the interviews and all the very best.

List of Shortlisted Students of Wipro Re-Assessment
S.No	Superset ID	Candidate Name
1	1441771	Lavan Mooga
2	1436414	Manasa Gone
3	1423572	Yashasvi Pothuri
4	1427604	Prashanth Palle
5	1427486	Rajkumar Medishetti
6	1398097	Manoj Bukya
7	1389026	Muppavaram Navya
8	1386072	Mounika kusumba
9	1511902	Sandupatla Sai Kiran
10	1512125	Bhanu Prasad Deshetti
11	1511099	Rakham Akhil
12	1445703	Rakesh Asa
13	1502595	Srikanth Gudise
14	1501376	SAI MONESH KAMMARI
15	1499112	Sridhar P
16	1498084	Sandeep Kasturi
17	1489237	DURUOSJU YAKESH
18	1455574	Mithila Pidishetty
19	1455313	Bandi Nikhil Goud
20	1453535	Gautam Ronanki
21	1450293	Pavani Reddy Bandi
22	1443537	RAMYA MANDA
23	1389952	BABURANI KOMMU
24	1435119	Damerla Mounish
25	1427734	Sadhika
26	1431884	Sagarika Jilla
27	1427987	SNEHITHKUMAR RACHA
28	1427682	MOHAMMAD SAMEER
29	1428445	AVUNURI DILEEP
30	1426027	Srikanth Bari
31	1423233	Chinnareddy - Sandhya
32	1424887	Vukanti Snehitha
33	1421512	PEDDI HARISHTEJA
34	1421230	Sohan Kumar Kasthuri
35	1421432	Jayanth Derangula
36	1416892	Akash Francis Bakka
37	1417342	surkanti kranthi kiran reddy
38	1414779	Maheshwari Balasukra
39	1406784	Maheshwari Bommanaboina
40	1405944	Racharla Anusha
41	1386169	ERRA AJITH
42	1389755	Divya Polu
43	1384950	KATRAVATH RAVITEJA NAIK
44	1386784	Yellammagari Sahanya

Sd/-
T &P Office.

Download: Notice Attachment

All the shortlisted students of Wipro Elite-22 do prepare well for the interviews and all the very best.

Find the list at the attached notice.

Sd/-
TnP Office

Download: Notice Attachment

The seating arrangement for ELL exam which would be conducted at 2:00pm on 16/9/2021 in AB-1 for the students of E-1 Sem-1 2020-21 batch and the for the students who need to take their remedial exam for the same is notified in the file attached.

Please occupy the classrooms and the seating according to the order specified in the file containing several tabs branch wise.


Download: Notice Attachment

Dear Students,
Dear all,
The DEC lab exam for ECE E1 students of AY 20-21 is scheduled on 16th September 2021@1:30PM
Venue:
C1:ABII-001
C2:ABII-210
C3: ABII-211
C4,C5-Seminar Hall
Dear Students,
The DEC lab exam for ECE E1 students of AY 20-21 is scheduled on 16th September 2021@1:30PM
Venue:
C1:ABII-001
C2:ABII-210
C3: ABII-211
C4,C5-Seminar Hall, ECE department.
P.S.: Bring your own exam planks (pads).
It is here by informed to all the students (TS) who are not registered/renewal for Postmatric Scholarship (Fresh and Renewal) are required to apply in epass website on or before 21.09.2021.
link is enabled now
https://telanganaepass.cgg.gov.in/epassonlinelinks.do
It is hereby informed that all the E-II students are required to pay Examination fee for the Academic Year 2019-20 and 2020-21 and E-I students are required to pay for the AY 2020-21. Students can collect bank challans at the Scholarship Section and pay in SBI-RGUKT Branch (Campus Bank).
Dear students
Please find the attachment for the detailed schedule of PPS lab External exam which will be conducted on 16th, 17th, 18th of September 2021 

Download: Notice Attachment

Dear Student,

It is hereby informed to all E4 CSE (B16 batch) that JARUS TECHNOLOGIES conducting recruitment drive for 2022 passing out students. Interested students need to register by 17th Sept 2021, 2:00PM.

ELIGIBILITY CRITERIA:

Branches: CSE
CGPA: 9.0 & above
Designation: Software Engineer
CTC: Rs. 3.50 – Rs. 4.50 LPA after the internship, depending on performance in Training.                                                 
Place of Posting: IDA Cherlapally, ECIL, Hyderabad.
Job Description: Developer
Internship Cum Job Offer: Yes (6 months)
Internship Stipend: 18000 per month

SELECTION PROCESS:

1.	Online Written test (Technical)
2.	Group Discussion
3.	Personal Interview
4.	Technical Interview

Registration Link: http://tnp.rgukt.ac.in

Last Date for Registration: 17th Sept 2021,2:00PM.


Note: We request all the registering students to Submit an undertaking form that you are interested in job after internship and will stay with company for minimum 2 years. Please find the Undertaking format attached below and mail the signed form to tnp.rguktb@rgukt.ac.in.


   Sd/-
Placement Office


Download: Notice Attachment

Dear All,
Please find the attached list which has students data with respect to PEP certification. Appreciate all who have put in lot of time and efforts in PEP program and hope you have taken away knowledge from it.
Congratulations to one and all who have achieved Diploma/Participation certificates and the same will be emailed to you in short time.
Please find below the eligibility criteria set to issue Diploma and Participation certifications.
NOTE: 
For more details contact EPAM PEP SPOC – RGUKT BASAR
             Mr.K.RAVIKANTH  				            Ms.K.GEETHA
              Assistant Professor					         Assistant Professor		       
EPAM-PEP-SPOC RGUKT-Basar		                EPAM-PEP-SPOC RGUKT-Basar

Download: Notice Attachment

Dear Students

Please find the enclosed subject cited above.

Sd/-
Academic Section.

Download: Notice Attachment

Dear Students,

It is here by informed to Civil Engineering, EEE, and MME students that AY19-20 E1 Sem1 Engineering Drawing lab exam will be conducted on 18th Morning at 9:30 AM in Civil Engineering Drawing Hall.


Sd/-
HOD CE.

It is informed to all the PUC-1(AY 20-21) students that outpass will not be issued to any students until the completion of Sem-II Examinations except on emergency grounds.


       Sd/-
CHIEF WARDEN. 
Dear Students,

It is here by informed to Civil Engineering, EEE, and MME students that AY19-20 E1 Sem1 Engineering Drawing remedial lab exam will be conducted on 18th Morning at 9:30 AM in Civil Engineering Drawing Hall.


Sd/-
HOD CE.
Dear all,

Please find the attachment.




sd/-
HoD,EEE

Download: Notice Attachment

Greetings,
E2-E3 external lab exams of ECE department schedule for AY 20-21 (ECE, EEE,CSE students) is attached with this notice.
All the best.

Download: Notice Attachment